[Clean Fix Construction Case Study] Keifuku Electric Railway Co., Ltd.
A total of 27 vehicles are targeted! Installation will be carried out on the vehicle front, fare box, boarding gate doors, handrails, and more.
We would like to introduce a case where we performed "Clean Fix Construction." The target of the construction was all vehicles of the Arashiyama Line of Keifuku Electric Railroad, with a total of 27 vehicles. The areas of construction included the front of the vehicle, fare box, boarding door, handrails, strap handles, push buttons, window frames, luggage racks, and sunshades. [Case Overview] ■ Date of Construction: October 2020 ■ Target: All vehicles of Keifuku Electric Railroad Arashiyama Line (Aranden) ■ Areas of Construction: Front of the vehicle, fare box, boarding door, handrails, strap handles, push buttons, window frames, luggage racks, sunshades *For more details, please refer to the PDF document or feel free to contact us.
- 企業:阪神施設工業
- 価格:Other